Hi guys,
lets assume we have changed the structure of a Cube on development. There is a Source databasis existing on this Cube connected to an LFD method where we have the possibilities now on development to define a new rule related to the structure change of the Source Cube. Is all that change applied on quality or production only after transported the Source databasis to quality and production again? Or when I now transport the databasis after the structure change of Source cube will there be any harm without transporting Source databasis to quality or production. Will on quality or production stay still the old structure of the Source cube?Can it fail the transport of databasis to quality or production?
When I do not transport the changed Cube structure and the related Source databasis + enhanced lfd methods but transport only Databasis to quality or production will that result in a dump?
Any hints, any tips, any experience any information related to this topic could help. thanks in advance.