Hi SAP Gurus,
i want to do the subcontactring operation for 20 operation of 10,20,30,40 operations of material-X. For this i have searched the forums in google; But i got a solution like creating a dummy material for the subcontracting operation ( Not x Material). But user is asking the without dummy material creation; they want do subcontracting operation with Header material-X only. Please guide me the way forward. Is it possible or Not ?
Regards,
Mastan.