hi Gurus,
is it possible to get STO proposal through Scope of Planning.
the scenario is like this i have 2 plants and i configure scope of planning for all the 10 plants.
plant Req quantity exist quan planned recp
A 500 200 150
B 600 300 500
in the above case if i run the scope of planning will system transfer the planned recp of plant B to Plant A because planned recp of plant B is more than its req quantity. is it possible through standard and what is the scope for development.
regard
mahesn.