Need help in Work-Center formula.

$
0
0

Hi,My query is that I have to define a new formula for a activity.Earleir I was using an Standard value key as ZAP1, which has six activity.In routing I have operation lines, and in each operation line , each of the work-center used SVK as ZAP1.Now I For meetign the new requirement for a line, I have created a new SVK as ZAP2, .My Quation is that it is possible to define differnet SVK for a WC and then used the different WC with diffrene SVK in routing.

Say routing

Operation Line Using WC with SVK ZAP1

Operation Line  Using WC1 with SVK ZAP2

Operation Line  using  WC3 With SVK ZAP3.

If so how Since in routing only Maxm of Six values will be populated.So will the requirement will be full filled.Awaiting for the feedback

 

Thanks