Hi gurus,
I´m implementing a variant configuration project, in the project the production order appear when i´m creating the sales order with a configurable material,and the customer sometimes need to change the super routing and the list of materials after de sales order when the production order is created, but all the procedures are not calculated if I change the operations or any material in the production order. in the transaction CO02 i only can see the configuration, but i cannot overwrite the configuration, there are any possibility to reactivate the configuration in the Co02 transaction,(in customizin or any user).
thanks in advance.