Hello Guys:
We are facing an issue. When executing cost estimate , system is taking MAP of components from material master based on two decimal points. Lets say to manufacture 1 MT of Product A we need 4 MT of components X whose MAP is 20.20 MT. While executing std cost estimate system correctly picks MAP of component and arrives at price of 4*12.20=48.8 , however when doing confirmation system consumes this material at 12.19999 * 4 MT=48.79 which is causing slight variance which client does not want. Please guide how this can be overcome.
Thanks