Hi,
I am looking for a product costing report to do the following :-
1) To see the variances between the actual cost and the standard cost estimate cost. In KKBC_ORD with target cost version of 0 i can see the target cost is based on standard cost estimate but it is scaled according to operating rate and it also uses the KP26 price of the current month whereas my cost estimate is an old cost estimate dated back to 6 months back. So i want to use the old cost estimate values as it is without being scaled by operating rate and also the KP26 prices used must be the prices used in the standard cost estimate.
2) Another report to see the variances between material ledger actual cost and standard cost estimates. There is no report for this. Same thing as number 1, the standard cost estimate should not be scaled by the operating rate and must use the KP26 price of the exact standard cost estimate prices.