Hi all,
I have to perform BI 7.2 system copy ( qas to dev),
as it is a Dual stack
please let me know, how to do that.
I want to know what options to select once the SAPINST (SWPM) is started,
whether i have to select Netwevear "ABAP" stack or "ABAP and JAVA" or i have to do both for abap and java stack seperately.
and also let me know same for the import process.
thanks
thomus